Mallorca (Spain) - 2x85 t/h
| Data of Project | |
| Final Customer: | TIRME (Spain) |
| SES Consortium partner: | Von Roll Inova (Switzerland) |
| Place: | TIRME, Palma de Mallorca, region Son Reus |
| Country: | Spain |
| Contract: | 2007 |
| Handing over: | 2009 |
| Technical parameters | |
| Number of boilers: | 2 |
| Type: | grate fired boiler |
| Nominal output: | 85 t/h |
| Nominal pressure of superheated steam: | 5.2 MPa |
| Nominal temperature of superheated steam: | 400 °C |
| Fuel Parameters | |
| Main fuel: | municipal waste |
Scope of Delivery
- basic and detail engineering, manufacture, assemby, commissiong.
