Ledvice (Czech Rep.)
| Project Data | |
| Investor: | ČEZ a.s. Praha (Czech Rep.) |
| Final Client: | Škoda Praha Invest s.r.o. (Czech Rep.) |
| Client: | Alstom Power Systems Stuttgart (Germany) |
| Alstom Power CZ Brno (Czech Rep.) | |
| Subject of project | Deliveries for supercritical boiler for 660MWe unit |
Scope of Project:
- Pressure parts
- detail engineering
- manufacture of pressure parts
- Steel structure
- Assembly of boiler
- Insulation
Key terms:
- Signing the contract: 02/2008
- Start of manufacture: 08/2009
- Start of assembly: 05/2010
- End of realization: 03/2012
