Počerady (Czech Rep.) - 2xHP254; RH305; MP55.5; LP48.6
| Data of Project | |
| Customer: | ŠKODA Invest, a.s. Praha |
| Place: | Počerady Power plant |
| Country: | Czech Republic |
| Contract: | 06/2009 |
| Handling over: | 03/2013 |
| Technical Parameters | |
| Turbine type: | SIEMENS SGT5 – |
| Boiler supplier | SES Tlmače |
| 2 | |
| HRSG, horizontal, triple pressure system | |
| Boiler parameters | HP: 254 t/h, 13.0 MPa, 552 °C |
| RH: 305 t/h, 2.82 MPa, 550°C | |
| MP: 55.5 t/h, 3.08 MPa, 350 °C | |
| 48.6 t/h | |
| 0.43 MPa | |
| LP: 48.6 t/h, 0.43 MPa, 290 °C |
Scope of Delivery
- The power plant unit consists of two gas turbines (Siemens), two waste heat boilers (SES Tlmače) and one steam turbine (ŠKODA POWER).
- HRSG is of horizontal concept, triple pressure with reheater and natural circulation of steam-water mixture in evaporators.
- Generated steam from pressure levels of the boiler is led to the individual stages of the steam turbine. The boiler can be operated with sliding as well as fixed pressure of steam. The range of regulation of boilers is from 54% to 100% of gas turbine output.