Products and Services

We supply power station units and heating plants, coal fired, oil & gas and biomass fired boilers, waste heat boilers and boilers firing various combinations of fuels. In our workshops we are fabricating the boiler house equipment, condensation and regeneration system, high pressure and low pressure pipelines, water treatment and fuel handling equipment.

Power plants

for combustion of coal, oil, gas, biomass and waste

Boilers

pulverised, fluidised, oil and gas, biomass, HRSG

Reconstructions

modernizations, emission reduction of NOx, CO, ...

Other equipments

Boiler parts and turbine hall component

Nuclear

equipment for nuclear power plants

Engineering

design solutions

References

The success of joint stock company Slovenské energetické strojárne (SES a.s.) is based on the know-how of highly qualified employees, almost 70 years of experience in the area and on the satisfied customers all over the world. SES a.s. has a place among the important boiler suppliers for power plants, heating plants, biomass and waste to energy plants.

North Yorkshire (Great Britain) - 2 x 61 t/h

North Yorkshire (Great Britain) - 2 x 61 t/h

zväčšiť
RNEST (Brazil), 400 t/h

RNEST (Brazil), 400 t/h

zväčšiť
Počerady (Czech rep.)

Počerady (Czech rep.)

zväčšiť
Bolu Goynuk, CFB 373 t/h, Turkey

Bolu Goynuk, CFB 373 t/h, Turkey

zväčšiť
Bocamina II, 1215 t/h, Chile

Bocamina II, 1215 t/h, Chile

zväčšiť
Colbun, 1215 t/h, Chile

Colbun, 1215 t/h, Chile

zväčšiť
Corlu (Turkey), 135 t/h

Corlu (Turkey), 135 t/h

zväčšiť
Vojany, Units 5,6 (Slovakia) – 2x110 MW, 325 t/h

Vojany, Units 5,6 (Slovakia) – 2x110 MW, 325 t/h

zväčšiť

News

Source: SES a.s.

SLOVENSKÉ ENERGETICKÉ STROJÁRNE a.s. signed a contract for work on the job order “Repair of B2 Unit” at Chvaletice Power Plant. The contract was signed on 30.4.2020 with the company Sev.en Engineering s.r.o., Chvaletice, the main contractor of the project for pre Sev.en EC, a.s. (Chvaletice Power Plant). The contract was signed on behalf and for SES by Ing. Dalibor Cucor, Commercial Director and Mgr. Milan Války, Financial Director. 

read more…

Source: SES a.s.

Our long-term customer Energetika Třinec is trying to eliminate the environmental emission burden. Stricter requirements for reducing emission limits according to new European legislation will also be ensured on operated fluidized bed boilers whose design, delivery and commissioning are the work of our company. By mutual agreement concerning business and technical conditions of both companies, SES Tlmače undertook to…

read more…

Source: SES a.s.

Work on the project of Třebovice DeNOx K14, K13, K12 continues with denitrification of the last K12 boiler. Currently, there are being manufactured new parts of the boiler, which are gradually dispatched to the construction site to begin assembly work. Dismantling of the existing parts of the boiler is gradually being completed on the construction site, as they will be replaced by new manufactured parts within the scope of the subject of boiler…

read more…

Source: SES a.s.

On April 2, 2019, SES Tlmače will participate in the Fair of Engineering Companies organized at the Faculty of Mechanical Engineering of the Slovak University of Technology in Bratislava. This event is an opportunity to reach about 350 students from the Faculty of Mechanical Engineering from all departments, directly at the faculty. We believe that our participation will contribute to raising awareness of SES Tlmače among future graduates of all fields of study…

read more…

Source: SES a.s.

Slovenské energetické strojárne, a.s. Tlmače (SES Tlmače) continues in successful implementation of denitrification of boilers in Třebovice power plant. The customer, Veolia Energie ČR, a.s. has put into effect the Option No. 2 of the Works contract on stage III of “Denitrification of boiler K12 in Třebovice power plant”. This option is included in the contract signed by SES Tlmače in the end of 2013 already and it is the last stage of this contract.…

read more…