News

Project Riverside 2

SLOVENSKÉ ENERGETICKÉ STROJÁRNE a.s. signed a contract for the supply of detailed engineering for Hitachi Zosen Inova AG for the Riverside 2 project (England). The contract was signed on 3/2023. The contract is for the supply of detailed engineering for two boilers for a municipal waste incineration plant. By signing this contract SES a.s. started cooperation with Hitachi Zosen Inova AG , which is a major supplier in this field and at the same time SES a.s. confirmed its…

read more…
New logo of SES Tlmače - return to tradition

New logo of SES Tlmače - return to tradition

From March 2023 SES a.s. Tlmače is returning to the traditions and the typical logo of the boiler drum that characterized the company for many years. This decision was not based on the decision of the company's management, but on the demands of colleagues and former employees of the company, because, according to them, the traditional iconic emblem of the company on the basis of which the company was known all over the world was missing. We believe that the change in the graphic design of the…

read more…
Project Vera II

Project Vera II

SLOVENSKÉ ENERGETICKÉ STROJÁRNE a.s. signed a contract for the VERA II Hamburg project. The contract was signed on 22 June 2022 with Steinmüller Engineering GmbH (Germany).  The contract was signed on behalf of SES by CEO and Chairman of the Board Ing. Lukáš Křítek and member of the Board of Directors Mgr. Ing. Mária Vrábelová.  This involves the design, manufacture, supply and supervision during the assembly and…

read more…
Mariel Project

Mariel Project

Boiler – Commissioning: Chemical cleaning and boiler blowing were completed. Algorithms were tuned and functional groups were tested. Defects and unfinished work are being remedied. Turbine Hall: Tests of the feed pump sequence, tests of the lifting oil system, tests of the sealing oil system and tests of the circulation pumps and the seawater system are underway. Tests in the EHV substation, blowing-through of the turbine halls have been completed. The tests progress is limited by…

read more…
KVA BUSCHHAUS Project for ENV (Germany)

KVA BUSCHHAUS Project for ENV (Germany)

In October 2019, our company signed a contract with ENVIROTHETM GmBH (Germany) for KVA BUSCHHAUS projects (Helmstedt) located in Germany.  It involves the design, manufacture, supply and supervision during assembly and commissioning of a waste heat boiler pressure system downstream of sludge combustion technology (supplied by Envirotherm) + boiler supply system + condensate system.  In 08/2020, manufacture of the first package of deliveries Package 1 (Boiler) was completed and…

read more…
Repair of B1 and B2 Units at Chvaletice Power Plant

Repair of B1 and B2 Units at Chvaletice Power Plant

After completion of engineering work, the project “Repair of B1 and B2 Units at Chvaletice Power Plant entered the phase of performance of work on the construction site. The purpose of repair of B2 Unit, specifically Boiler K2, where SES a.s. participated in works, is to reduce emissions and to achieve the required NOx parameters and CO concentration in dry flue gas. The main scope of work to achieve the parameters consisted of modelling the combustion process with subsequent replacement…

read more…